BORANG

Location
Palembang

Owner
PT. Wijaya Karya (Persero)

Work Area
E/M & Sipil

Scope of work
Detail Engineering Design
PLTG Borang 60 MW And Substation 150 kV, 2 Trafo Generator Bay, 1 Feeder Bay and Modification of Existing Line Bay GI Borang pada Bay the 13th

Year
2011